Project 1.
1. Project type:
Infrastructure - Bridges - Roads
2. Project title: 
Constructing aerial road - line 1 (along Nhiêu Lộc Canal–Thị Nghè, from Lăng Cha Cả to Thị Nghè bridge)
3. Location:
District 1, District 3, Tân Bình District, Bình Thạnh District, Phú Nhuận District
4.  Total land use area: 
5. Project objectives: 
Creating additional corridors along the North-South axis to reduce traffic pressures on the central area and connecting Tân Sơn Nhất airport with the center of the city.
6. The expected investment capital: VND 13,230 billion (equivalent to US$ 601 million)
7. General information on the project 
Construction scale:
+ Road length: 10.8 km
+ Road width: 16.5 m
Decision No. 631/QĐ-TTg of the Prime Minister: Issuing the List of National Projects Calling for Foreign Investment until 2020
8. Form of investment: BOT or BOT combined with BT (BOT should be prioritized)
 
Project 2.
1. Project type:
Infrastructure - Bridges - Roads
2. Project title: 
Constructing aerial road - line 2 (from the intersections of line 1 at Tô Hiến Thành – Lữ Gia – Bình Thới roads - Road No. 3 to Ring road 2)
3. Location:
District 10 and 11, and Bình Chánh District
4.  Total land use area: 
5.  Project objectives: 
Constructing radial aerial road running from central area to the West of the city.
6. The expected investment capital: VND 15,843 billion (equivalent to US$ 720 million)
7. General information on the project 
Construction scale:
+ Length: 10.2 km,
+ Width: 17.5 m.
Decision No. 631/QĐ-TTg of the Prime Minister: Issuing the List of National Projects Calling for Foreign Investment until 2020
8. Form of investment: BOT or BOT combined with BT (BOT should be prioritized)
 
Project 3.
1. Project type:
Infrastructure - Bridges - Roads
2. Project title: 
Constructing aerial road - line No. 3:(from the line No. 2 in Tô Hiến Thành - Lê Hồng Phong - Lý Thái Tổ - Nguyễn Văn Cừ - North-South Axis - Nguyễn Văn Linh)
3. Location:
District 5, 7 and 10
4.  Total land use area: 
5. Project objectives: 
Constructing radial aerial road to connect the central area to the South of the city.
6. The expected investment capital: VND 11,000 billion (equivalent to US$ 500 million)
7. General information on the project 
Construction scale:
+ Length 7,3 km,
+ Width 16.5 m.
Decision No. 631/QĐ-TTg of the Prime Minister: Issuing the List of National Projects Calling for Foreign Investment until 2020
8. Form of investment: BOT or BOT combined with BT (BOT should be prioritized)
 
Project 4.
1. Project type:
Infrastructure - Bridges - Roads
2. Project title: 
Constructing aerial road line 4 (Starting from high way 1 (intersecting with line 5) – Vườn Lài - crossing Vàm Thuật River at Lăng canal and North South railways (at Đen bridge) – planned Phan Chu Trinh road extends beyond Mỹ Phước apartment buildings and joins Điện Biên Phủ road, which intersects with line 1)
3. Location:
District 3, District 12, Bình Thạnh District and Gò Vấp District
4.  Total land use area: 
5. Project objectives: 
Constructing a high-above radial axis from the central area toward the North of the city.
6. The expected investment capital: VND 15,000 billion (equivalent to US$ 682 million)
7. General information on the project 
Length: 7.3km, Cross section: 17.5m.
Decision No. 631/QĐ-TTg of the Prime Minister: Issuing the List of National Projects Calling for Foreign Investment until 2020
8. Form of investment: BOT or BOT combined with BT (BOT should be prioritized)
 
Project 5.
1. Project type:
Infrastructure - Bridges - Roads
2. Project title: 
Construction of aerial road, line 5 (coincides with ring road 2 (national highway 1) from the intersection of Station 2 to An Lạc intersection)
3. Location:
Thủ Đức District, District 12, Hóc Môn District, Tân Bình District.
4.  Total land use area: 
5. Project objectives: 
Constructing aerial ring road to improve the ability of connecting aerial road system of the city.
6. The expected investment capital: VND 97.651 billion (equivalent to US$ 4.439 million)
7. General information on the project 
Length: 34km, Cross section: 18.5m
Decision No. 631/QĐ-TTg of the Prime Minister: Issuing the List of National Projects Calling for Foreign Investment until 2020
8. Form of investment: BOT or BOT combined with BT (BOT should be prioritized)